This proposal break the proposal up into 2 parts. The main roof as one part and the lower roof into another part under the same proposal.
Question asked
Would it be to better to replace all materials between the wall and curbed unit with EPDM and tie-in to the standing seam pans at each side of the unit on this lower roof?
Answer
There would be significantly fewer seams to worry about leaking later. We would like to extend the EPDM up to the parapet on the right side and angle the metal to EPDM connection on the left side. Recommend removing or replacing the remaining lower valley, as it is currently a W-Style valley, which would make it challenging to seal the rubber-to-valley connection. We could still use a metal valley, but it would be better to go with a V-Style valley or remove the valley entirely and lock the panels onto an attachment cleat instead. In either case, changing that area to rubber would be a good choice. Please see documents attached below.
We have extended the deadline to 3/28/2025 11 AM
Scope of Work
EPDM Roof Replacement – Upper Main Roof
EPDM Roof Replacement – Lower Main Roof
Metal Roof Removal & Replacement at Low Slope Tie-in
Equipment & Misc
Rental Equipment
Building Permit
Documents